Episode Overview
A locomotive requires a double bogie replacement to return to the sugarcane harvest, while traction motors from the mining trains are undergoing repairs. Additionally, the pressure is mounting for a challenging air conditioner swap.
Show Information
Season 1 Episodes 10
1.
All Aboard An Australian Icon
2.
Getting a Freight Train to the Finish Line
3.
High Stakes Engine Rebuild
4.
Getting A Cane Loco Back To Harvest
5.
One Day Mission To Replace Freight Engine
6.
Single Day Traction Motor Challenge
7.
High Precision Gear Box Overhaul
8.
Rusty Water Tank Cut Off Steam Loco
9.
Loco Maintenance Team Expect The Unexpected
10.
The Heat is on to Crane in a Rooftop
Servers