Episode Overview
Tommy enlists an excavator to start laying the foundation for the new porch. Meanwhile, Norm meets with homeowner Katherine and kitchen designer Linda Cloutier in the newly opened kitchen to explore the layout. They then visit Linda's showroom to review cabinet and countertop options. Kevin assists Tommy and his team in framing the new closet and bathroom for the master suite. On the third floor, to address ice damage throughout the house, Tommy uses a large vacuum to remove the old fiberglass insulation. Back on the second floor, Norm and Tommy adjust an existing door to fit the smaller opening for the kids' bathroom.
Show Information
Season 37 Episodes 26
1.
Belmont Victorian: Dude, Where's My Victorian
2.
Belmont Victorian: The Kitchen Came Tumbling Down
3.
Belmont Victorian: Bracing The Basement
4.
Belmont Victorian: It's All About Beams
5.
Belmont Victorian: It's Foundation Time
6.
Belmont Victorian: Opening the Entry
7.
Belmont Victorian: Victorian 2.0
8.
Belmont Victorian: Antiques for an Antique House
9.
Belmont Victorian: True Colors
10.
Belmont Victorian: Victorian Warmth
11.
Belmont Victorian: Grinding Out the Details
12.
Belmont Victorian: This Old Tree House
13.
Belmont Victorian: What's Old Is New Again
14.
Belmont Victorian: Inside Out Restoration
15.
Belmont Victorian: The Final Countdown
16.
Belmont Victorian: Goodbye Tired Old House
17.
North Shore Farmhouse: This Old New House
18.
North Shore Farmhouse: The North Shore Is a Blast
19.
North Shore Farmhouse: Truck in the New House
20.
North Shore Farmhouse: North Shore Framezilla
21.
North Shore Farmhouse: Up On The Roof
22.
North Shore Farmhouse: 400 Years of Home Technology
23.
North Shore Farmhouse: Making New Look Old
24.
North Shore Farmhouse: House Requires Some Assembly
25.
North Shore Farmhouse: A Race to the Punch List
26.
North Shore Farmhouse: What's New Is Old Again
Servers