Episode Overview
The team rejuvenates the front panel door using flexible epoxy and a fresh coat of paint. The newly installed marble island features a hidden surprise: a discreet hole that leads to a compost bin. Meanwhile, Rich focuses on enhancing the ducted HVAC system. Norm creatively repurposes two vintage doors to craft stylish sliding barn doors for the entryway.
Show Information
Season 33 Episodes 26
1.
Bedford | Welcome to the Bedford Project
2.
Bedford | And the Work Begins
3.
Bedford | Work on the Addition Begins
4.
Bedford | New Entrance, Old Bricks
5.
Bedford | Yard and New Gable Wall
6.
Bedford | New Space Revealed
7.
Bedford | Insulation, Roofing
8.
Bedford | Kitchen Inspiration
9.
Bedford | A New Driveway
10.
Bedford | Interior Design Ideas
11.
Bedford | Milestones In and Out
12.
Bedford | A Major Milestone
13.
Bedford | On the Right Path
14.
Bedford | Doors and Tabletops
15.
Bedford | Final Touches
16.
Bedford | Final Reveal
17.
Barrington; An Introduction
18.
Barrington; Hurricane Irene
19.
Barrington; Building a Clambake!
20.
Barrington; A Newport Mansion
21.
Barrington; Coastal Landscape
22.
Barrington; The Finishes Begin
23.
Barrington; Cherry Kitchen
24.
Barrington; Wall Dressing
25.
Barrington; The Finish Line
26.
Barrington; Another Project Wraps
Servers