Episode Overview
The master carpenter finishes the curved frame for the front portico deck, while the general contractor inspects the newly installed engineered wood framing for both the kitchen and the master bath. Meanwhile, excavator Herb Brockert starts digging the leaching field for the new septic system, and asbestos is being safely removed from the pipes in the basement.
Show Information
Season 13 Episodes 26
1.
The Wayland House - 1
2.
The Wayland House - 2
3.
The Wayland House - 3
4.
The Wayland House - 4
5.
The Wayland House - 5
6.
The Wayland House - 6
7.
The Wayland House - 7
8.
The Wayland House - 8
9.
The Wayland House - 9
10.
The Wayland House - 10
11.
The Wayland House - 11
12.
The Wayland House - 12
13.
The Wayland House - 13
14.
The Wayland House - 14
15.
The Wayland House - 15
16.
The Wayland House - 16
17.
The Wayland House - 17
18.
The Wayland House - 18
19.
The Wayland House - 19
20.
The London House - 1
21.
The London House - 2
22.
The London House - 3
23.
The London House - 4
24.
The London House - 5
25.
The London House - 6
26.
The London House - 7
Servers